Location:Fort Bragg, NC
Owner:US Army Corps of Engineers, Savannah District
Construction Time:1 Year
Size:14,500 SF
Construction Type:New Construction
Procurement Type:Design-Bid-Build

This is a new facility was built directly adjacent to the existing facility. The applicable standard definitive design functional requirements will be incorporated into the facility. This new facility will have an operations center, observation area, planning room, A/V control room, lobby, break room, storage, restrooms, mail room, SIPR Room and telecommunication room. The building will be conditioned using a four pipe VAV air handling unit system, with cooling coming from an air cooled chiller and heating coming from a boiler. All HVAC systems will be redundant.

Site development includes installation and relocation of water, sewer, gas, and electric utilities and communication lines; fire protection; paving, curbs and gutters; and antiterrorism measures. Site demolition included removal of pavements and sidewalks.

More Federal/Military Projects

MCAS Canal Bank Erosion Control

Beaufort, SC

More Info

Admin Facilities Rehab: BNHQ Bldg 21605 & COF Bldg 21719

Fort Gordon, GA

More Info

Access Control Point Chicken Road

Fort Bragg, NC

More Info

Good Hope Maneuver Area Interior Low Water Crossing Improvements

Fort Benning, GA

More Info

Booker Range Renovation & Modernization

Fort Benning, GA

More Info

Repair High Pressure Fire Protection System – Ph I

Simmons Army Airfield, NC

More Info

Admin Facilities Rehab BNHQ & COF Buildings

Fort Gordon, GA

More Info

Army Reserve Center

Greenville, SC

More Info

Training Aids Support Center

Fort Gordon, GA

More Info

Chosin Range Repair

Beaufort, SC

More Info

US Air Force Building 162 Renovation

Charleston Air Force Base, SC

More Info