DeFlorez Bldg 3rd Floor – Building Modifications
Location: | Orlando, FL |
Owner: | NAVFAC |
Completion Date: | September 2020 |
This work includes the demolition and removal of 496 existing cubicle units and furniture throughout third floor of the DeFlorez Building. Assembly and installation of 585 new cubicle stations, including reorganizing and re-feeding power and communications wiring through the existing in-floor raceway system to the new power and data/telecommunication locations in the new furniture systems. The project also involved replacement of carpet disturbed by the furniture and wiring changes, painting, and installing new exit lighting along the corridor bulkhead. Additional electrical panelboards provided to accommodate electrical circuits.